مجموعه پرشین راد گروه (پرادکو)، فعالیت خود را از سال ۱۳۸۴، با محوریت مهندسی، مشاوره، ساخت و مدیریت در حوزه های نفت، گاز و پتروشیمی آغاز نموده است.
Peradco, according to its constitution, in the following fields and other matters that are somehow related to the company’s specialized field; It works.
Executive records in the field of oil and gas, including supply of goods, engineering and implementation (EPC)
پرشین راد گروه
| row | job description | contract type | Employer | Treaty time |
|---|---|---|---|---|
| 1 | Repair and reconstruction of Mahshahr petrochemical port docks | PC | National Petrochemical Industries | 1396 |
| 2 | Repairing scours of submarine pipelines of Company 14 Iran's oil terminals | PC | Oil Terminals Company Iran | 1396 |
| 3 | 3 gas transmission pipelines of 6 inches by the 15 PC method | PC | Engineering and Development Company Gas | 1396 |
| 4 | Description of polyethylene gas to Luleman cluster of Fuman functions with a length of 254 km and line 16 Supplying 4 T.B.S stations and constructing and installing 5701 polyethylene branches | PC | Gilan Province Gas Company | 1395 |
| 5 | Designing, supply of goods and implementation of transmission line "16 and station 17 Reducing the pressure of 100,000 Ghadir reed steel | EPC | Ghadir National Steel Company of Iran | 1394 |
| 6 | Preliminary and advanced engineering consultant services for the project Glycol system contact tower 3 and liquid Gachsaran gas burner | E | Gachsaran Oil and Gas Exploitation Company | 1394 |
| 7 | Operation and gas administration services of Abhar and Khodabandeh district | C | Zanjan Gas Company | 1392 |
| 8 | marketing mapping services of supply lines and cathodic protection and distribution network of 20 villages of Gilan with a length of 1200 km | E | Gilan Province Gas Company | 1391 |
| 9 | Replacement of desalination wastewater pipe 21 with a length of 15 km Maron 3 to | PC | Maron Oil and Gas Exploitation Company | 1390 |
| 10 | Construction of the pipeline "10 Sarostan to Saadat Abad with a length of 60 km | C | Iran Naft Design and Construction Company | 1390 |
| 11 | Consulting services for the transfer of salty oil 23 Gachsaran 1 and 2 to Paznan desalination 2 | E | Gachsaran Oil and Gas Exploitation Company | 1390 |
| 12 | marketing mapping services of supply lines and cathodic distribution and protection network of Gilan villages with a length of 2000 km | E | Gilan Province Gas Company | 1390 |
| 13 | Basra refinery shed construction project | C | Masafi al-Janoob | 2012 |
| 14 | Changing the PC control and monitoring system of booster separators | E | Gachsaran Oil and Gas Exploitation Company | 1390 |
| 15 | Construction of gas transmission line "56 Fajr Jam Refinery to Kangan gas pressure boosting PC station, 5 km long | C |